Skip to the content
Documentation
Help Start
Reading in:
  • German: 9,155 of 9,155 pages
About the help in other languages
All help pages

Switching to Exponential

What a business needs to know before moving a site to Exponential 6 - from an older release of the eZ Publish years, from eZ Platform or Ibexa, from another host, or from another system such as WordPress or Drupal - the…

Download as PDF

Address: https://doc.exponential.earth/exphelp/viewer/help/businesses/choosing/switching-to-exponential.md

On this page

Switching to Exponential

This page is for owners and managers who consider moving an existing site to Exponential 6, and for the project manager who will plan it. It explains the documented paths, what drives the effort, and how to plan a switch that does not put the business at risk. The technical steps are in the installation book; this page tells you which chapter fits and what to decide.

Contents

  1. Which path is yours
  2. Why switch now
  3. What drives the effort
  4. A phased plan
  5. Decisions only you can make
  6. Risks and how to reduce them

Which path is yours

Your site runs todayPathRead
Exponential 6.0.x, and only the host changesa move, not a migrationMoving a site between hosts
An older 6.0.x releasean update within the lineUpgrading, part C
4.x (from the eZ Publish years)a migration to 6Migrating from 4.x
5.x with the legacy kernela migration to 6Migrating from 5.x legacy
eZ Platform or Ibexa DXP/OSStwo destinations: Exponential Platform Nexus, or the Exponential 6.0 legacy kernelMigrating from eZ Platform and Ibexa
WordPress, Drupal, Joomla, Magento, Shopify, Contentful, AEM, site builders, static HTMLa content migration with export and importMigrating to and from Exponential

The hosting view of the same paths is in Migrations for hosts.

For the content migration from another system, the extension 7x SQLI Import reads the export files of WordPress, Drupal, Joomla, Shopify and WooCommerce, spreadsheets and APIs, maps them to your content types without code and shows a dry run before anything is published (7x SQLI Import: start here).

Why switch now

  • Old versions get no security fixes. "5.x, 4.x, 3.x and older" are not supported; 6.0 is the maintained line (SECURITY.md). A site from the eZ Publish years is running without fixes.
  • Current PHP. Exponential supports PHP 8.0 to 8.5 (PHP 7.4 usable without support) (README.md), so the site can move to a supported PHP as well.
  • A shared database heritage. For 4.x and 5.x legacy sites, the content model and much of the database carry over; the chapters explain what changes and what does not (14.1 What changes, and what does not).
  • No license fee after the switch (README.md, "License"), and no lock-in (What you do not pay for).

What drives the effort

From the installation book (for example 14.15 How long it takes):

DriverWhy it matters
Size of the content tablesdump, restore, conversions and reindexing grow with rows
Number and size of stored filescopying var/ takes time
Your own extensions and PHP codeporting them to PHP 8 grows with lines of your own code, not with database size
Templates and designold designs may need rework; Twig templates of eZ Platform become TPL on the legacy kernel
Searchreindexing is often the longest single step
Languages and URLsURL aliases per node and language must be rebuilt and checked
Integrationspayment, single sign-in, feeds and APIs must be retested

From another system, the effort is in mapping its content to Exponential's content model and keeping URLs working with redirects (Migrating to and from Exponential).

Note

The project gives no hour or price figures for a migration, and neither does this page. Measure the duration in a rehearsal and plan from the measurement, as the installation book advises.

A phased plan

  1. Inventory. List content types, languages, extensions, integrations and traffic. The book's chapters start with this step.
  2. Choose the path and a partner if needed (Choosing a partner).
  3. Rehearse on a staging copy. Run the whole migration on a copy and measure every step.
  4. Verify. Check content, URLs, forms, the store and sign-ins on the copy; the chapters have verification sections and checklists.
  5. Plan the cut-over. A content freeze, a maintenance window with maintenance mode, and the final run.
  6. Keep a rollback plan. The old site and its backups stay ready until the new one is accepted (14.14 Rollback plan).
  7. Go live with the Go-live checklist.
  8. Aftercare. Watch logs, 404 errors and search for the first weeks.

Decisions only you can make

  • To do: Which content to move, and which to archive or drop.
  • To do: Whether the design is kept or renewed at the same time (doing both raises risk).
  • To do: When the freeze and the maintenance window happen, considering your busy periods.
  • To do: Who accepts the result, and by which criteria (Quality gates and acceptance).
  • To do: How you tell customers and staff.
  • To do: For eZ Platform and Ibexa sites: which of the two destinations fits.

Risks and how to reduce them

RiskReduce it by
Lost content or broken linksrehearsal, verification lists, redirects for changed URLs
Longer downtime than plannedmeasured rehearsal, a window with margin
Custom code that will not run on PHP 8porting it before the cut-over (14.9)
Passwords that no longer workthe chapters' sections on users and password hashes
Search incomplete after the switchreindexing planned, or finished after the switch if acceptable
No way backa tested rollback plan and kept backups

Become an Exponential Partner

Partners share their information, provide funding, contribute back and develop the products with us, and that is how Exponential grows. A partner website and dashboard are planned for mid-2027: please become a partner today to speed up our growth rate and land new features faster.

Something wrong on this page? Report an error

Documentation license

This documentation is free documentation, licensed under the GNU Free Documentation License 1.3 or later.

Exponential Copyright © 1998-2026 Exponential Foundation and 7x