Skip to the content
Documentation
Help Start
Reading in:
  • German: 9,155 of 9,155 pages
About the help in other languages
All help pages

The first 90 days for emergency services

A 90-day plan for a fire and rescue service or emergency management body starting with Exponential - incident procedure and availability first, then content, then a launch after an incident rehearsal - with checks.

Download as PDF

Address: https://doc.exponential.earth/exphelp/viewer/help/government/levels/emergency-services/first-90-days.md

On this page

The first 90 days for emergency services

This page is for project managers and administrators who start an emergency service site on Exponential. Prove that incident information can be published fast and served under load before anything else. It assumes an installation exists (Getting started).

Contents

  1. Days 1 to 30: incident procedure
  2. Days 31 to 60: availability
  3. Days 61 to 90: content, rehearsal, launch
  4. Ongoing

Days 1 to 30: incident procedure

StepCheck
Agree who publishes incident information, at which hours, and who checks itan on-call list with at least two people per shift
Create the Incident update class and the Incidents folder (Content model)a test update publishes
Create the Incident publisher role and accounts, with two-step sign-in (Structure)every on-call person has signed in from a phone
Show ongoing incidents at the top of the front pagethe test update appears there
Configure [HideSettings] and confirm the global cronjob part runsa test update with a past end time is hidden
Write the procedure: publish, update, end, correct, take down a false updatea one-page procedure

Days 31 to 60: availability

StepRead
Measure normal and peak load from past incidentsyour statistics
Configure the static cache and the offload rules; generate itStatic cache generator
Decide on Velocity's response cache and a CDNVelocity response cache, HTTP caching and CDNs
Load test with caches ona measured result above the expected peak
Test: stop PHP or the database on a test installation; do static pages still answer?Alerts, availability
Rehearse maintenance modeMaintenance mode
Plan for a failure of the hosting sitea written plan (second site, DNS, CDN)

Days 61 to 90: content, rehearsal, launch

StepRead
Write preparedness and prevention guides in plain languageRequirements emphasis
Translate key instructions into the area's main languagesContent languages
Full incident rehearsal at night with the on-call teamthe procedure
Accessibility test on a phone with a screen readerTesting accessibility
LaunchLaunch checklist

Checks at launch:

  • To do: In the rehearsal, an update appeared to visitors within the agreed time, including through every cache.
  • To do: The emergency number is on every page.
  • To do: Every on-call person has published at least once.

Ongoing

WhenTask
Each shift changethe on-call list is current
Monthlya short publishing drill
After each incidenta review of what took too long
Yearlypreparedness guides reviewed; load test repeated

Become an Exponential Partner

Partners share their information, provide funding, contribute back and develop the products with us, and that is how Exponential grows. A partner website and dashboard are planned for mid-2027: please become a partner today to speed up our growth rate and land new features faster.

Something wrong on this page? Report an error

Documentation license

This documentation is free documentation, licensed under the GNU Free Documentation License 1.3 or later.

Exponential Copyright © 1998-2026 Exponential Foundation and 7x